Insert Logo Here

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Current Projects

Stambeno-poslovni objekat Rakčević, Podgorica

Assignment description:

Conceptual and Final design and workmanship drawings of Apartment/Office building - Rakcevic, at UP 5 and 5A, DUP "Stambena zajednica 6 – Krusevac, bloc 19, aprox. 2,900m2, Podgorica

Position in the project:

Chief structural designer

Beneficary:

Kolosmont d.o.o., Budva

Date:

Apr 2009 - to date

Stambeno poslovni objekat Stara vatrogasna, Podgorica

Assignment description:

Technical acceptance procedure "Use permit) after the Construction of Apartment/Office building - Stara vatrogasna, approx. 8.700 m2, Podgorica

Position in the project:

Member of official body - reporting on structural works

Beneficary:

Ave Marija Koljcevic doo, Podgorica

Date:

Dec 2009 – to date

Hotel Palma, Tivat

Assignment description:

Final design and workmanship drawings for reconstruction of Hotel Palma, Tivat, approx. 6,000 m2

Position in the project:

Chief structural designer

Beneficary:

HTP Primorje, Tivat

Date:

Jun 2011 - to date

Hotel Planinka, Zabljak

Assignment description:

Final design and workmanship drawings for reconstruction of Hotel Planinka, Zabljak, approx. 7,000 m2

Position in the project:

Chief structural designer

Beneficary:

HTP Primorje, Tivat

Date:

Dec 2011 - to date

Hotel Garni, Njegoseva, Podgorica

Assignment description:

Final design and workmanship drawings of Hotel Garni, Njegoseva st, Podgorica, approx. 1,200 m2

Position in the project:

Chief structural designer

Beneficary:

Private investor

Date:

Nov 2011 - to date