Insert Logo Here

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Roads

Autoputevi kroz Crnu Goru

Assignment description:

Preparation of Tender dossier “FIDIC based), Technical conditions, Design briefs and other necessary technical documentation for the Preliminary design of Motorways through Montenegro, sections: Bar – Tanki rt, Tanki rt - road Cetinje/Podgorica, Smokovac – road Cetinje/Podgorica, Smokovac – Matesevo, Podgorica bypass, Andrijevica – Berane – Boljare

Position in the project:

Project management team member

Beneficary:

Directorate of Public works

Date:

May 1997 – Aug 1999

Autoputevi kroz Crnu Goru

Assignment description:

Management of the preparatory technical activities “Design briefs, Tender documentation, revision of Preliminary design etc) for the design and building of Motorways through Montenegro

Position in the project:

Project management team member

Beneficary:

Directorate of Public works

Date:

Jan 1998 – Sep 2000

Baza podataka za autoputeve kroz Crnu Goru

Assignment description:

Design brief for building a Datebase necessary for the project management of the Design of Motorways through Montenegro, Podgorica

Position in the project:

Project management team member

Beneficary:

Directorate of Public works

Date:

Jul 1998 - Sep 1998

Autoputevi kroz Crnu Goru

Assignment description:

Cost Benefit Analysis for the Preliminary design, Motorway through Montenegro, sections Andrijevica – Berane – Boljare and Bar – Tanki rt

Position in the project:

Project management team member

Beneficary:

Directorate of Public works

Date:

Sep 1998 – Nov 1998

Objekti na Autoputu kroz Crnu Goru

Assignment description:

Preparation of Technical conditions, Design briefs and other necessary technical documentation for the Conceptual and Preliminary design of structures “bridges, viaducts, tunnels etc) on primary roads Djurmani - Tanki rt and Smokovac – road Cetinje/Podgorica, in total more than 20 structures

Position in the project:

Project management team member

Beneficary:

Government of Montenegro

Date:

Apr 1999 – Aug 1999

Saobraćajnica Podgorica - Aerodrom Golubovci

Assignment description:

Reconstruction of the primary road from Podgorica to airport Golubovci, EU/OBNOVA contract

Position in the project:

Resident Expert EAR

Beneficary:

Technital, Italy

Date:

Jun 2000 - Dec 2000

Trotoar uz put Duklo - Mokra Njiva, Nikšić

Assignment description:

Technical assessment/revision of the Final design of Pavement structure on the road Duklo – Mokra njiva, aprox. 1,500m, Niksic, financed by USAID

Position in the project:

Team leader of the official body

Beneficary:

CHF Montenegro

Date:

Aug 2003 – Sep 2003

 

Prethodno stanje

Objekti na magistralnom putu M18, dionica raskrsnica Bralenovica – petlja – benzinska pumpa Euro petrol, Danilovgrad

Assignment description:

Preliminary and Final design of Reconstruction of primary road M18, section: Junction Bralenovica – Junction – Petrol station Euro petrol, Danilovgrad

Position in the project:

Member of official body - reporting on structural design

Beneficary:

Directorate for traffic, Podgorica

Date:

Jun 2009 - Nov 2009

 

Drawings