Insert Logo Here

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hydro technical Structures

Postrojenje za prečišćavanje odpadnih voda grada Nikšića

Assignment description:

Expertise on the current state and usability of the Main waste water treatment plant, Niksic

Position in the project:

Project Manager

Beneficary:

NGO COOPI, Italy

Date:

Nov 2000 - Dec 2000

Postrojenje za prečišćavanje odpadnih voda grada Nikšića

Assignment description:

Tender dossier “FIDIC based) for the selection of the Designer and Contractor “TURN KEY contract) for the Reconstruction of the Main waste water treatment plant, Niksic

Position in the project:

Project Manager

Beneficary:

NGO COOPI, Italy

Date:

Dec 2000

Odlagališta pepela pri Termoelektrani Pljevlja

Assignment description:

Technical assessment/revision of the Final design of Hydrotechnical structures for reconstruction and increase in size of ash stockpile, Maljevac, Pljevlja

Position in the project:

Member of official body - reporting on structural design

Beneficary:

Electricity board of Montenegro

Date:

Sep 2003 – Nov 2003

Tunel Vrmac, Kotor

Assignment description:

Technical assessment/revision of the Final design of hydrotechnical structures and of the Programme of monitoring ground and structures for the Reconstruction of Tunnel Vrmac, Kotor

Position in the project:

Member of official body - reporting on structural monitoring and design of hydrotechnical structures

Beneficary:

Ministry of maritime and traffic

Date:

Jan 2004 – July 2004

Most u Maljeviku, Sutomore, Bar

Assignment description:

Final design and workmanship drawings of a Bridge in Maljevik, 3 different versions, Sutomore

Position in the project:

Chief structural designer

Beneficary:

Bar Municipality

Date:

Apr 2006 – Jun 2006

 

Drawings

Prethodno stanje

 

Glavni kolektor atmosferske kanalizacije, Starom aerodrom, Podgorica

Assignment description:

Technical assessment/revision of the Final design of the Main drainage collector system, Podgorica

Position in the project:

Member of official body - reporting on structural design

Beneficary:

Podgorica Municipality

Date:

May 2007 – Jun 2007